Week 2 Its been a pretty good start.
This week I have had site visits to confirm the caravan will be able to be sited with ease. The water has been uncovered (thank you to whichever imp did that!) and I have began researching options for rain water collection. I am currently begining the deign and considering the benefits vs the cost. A rainwater system could take a week or two to prepare so this needs to be considered at the very beginning to save any unecessary work later.
0 Comments
|
Intro...
I'm Terri a conscious creator & I design spaces for authentic expression and connection. Archives |